In-house potting: 7 hidden costs that don't show up in your calculation
Updated: Nov 10
Potting in-house looks cheap: a bit of resin, a few hours of technician time. But that calculation often compares a complete quote with an incomplete internal cost. Here are the seven costs people forget to count, and a worksheet to put numbers on yours.

You have an electronic product that has to withstand moisture, vibration or shock. For the first units, the answer seems obvious: grab an epoxy kit, improvise a mold and pour it yourself. For a handful of prototypes, that is often the right call.
The problem starts when volumes grow. The usual calculation fits on one line: resin price plus labour time. A subcontractor's quote, on the other hand, includes everything: material, tooling, inspection, rejects, experience. Comparing the two is comparing apples and oranges.
15–20% of revenue: how much quality-related costs can reach, according to the American Society for Quality. (Source: ASQ)
1. Opportunity cost: what your engineers aren't doing in the meantime
In many SMEs, potting isn't done by a dedicated operator. It's done by the engineer who designed the product, or the most skilled technician on the team. Every hour spent mixing, degassing and pouring is an hour taken away from design, testing or customers.
To put a number on that hour, use the fully loaded cost: salary, benefits, employer contributions, facilities. Not the gross salary.
The real price is delay. A launch that slips by a few months leaves the market to competitors. And when the shop is already full, you end up turning down contracts.
2. Interruptions: the hidden cost of "pouring a small batch"
In-house potting is rarely continuous. You interrupt design work to pour a batch, come back the next day to demold, go back to rework a defective part. Every switch from one task to another has a price.
23 min 15 s on average to get back to an interrupted task, according to Gloria Mark, a researcher at the University of California, Irvine. (Source: Fast Company, 2008)
In a lab study, her team also found that people who are interrupted work faster to compensate, but at the cost of more stress, frustration and effort. Three pours a week means at least three breaks in work that requires focus. And a rushed engineer pouring "between two meetings" is not in the best position to produce a defect-free potting.
3. Poor quality: when one bubble costs the whole assembly
This is the most underestimated cost. Manual potting is sensitive to many details: ratio, mixing, humidity, temperature, pour speed. The most common defect is the air bubble, or void.
A void isn't just a cosmetic problem. It reduces heat dissipation, weakens electrical insulation, lets moisture in and creates a weak spot that cracks under vibration. In other words, it cancels out part of the protection the part was potted for in the first place.
A failed part costs far more than the resin. Once the resin has cured, the board, components and wiring are usually lost with it: potted parts are rarely repaired.
1 · 10 · 100: the well-known quality management rule that $1 invested in prevention saves $10 in correction and $100 in field failure. (Source: EASE)
The worst case is the defect that passes inspection and fails at the customer's site. A repeatable process with controlled parameters costs less than a series of "almost good" batches. Read also: how low-pressure overmolding compares to epoxy potting.
4. Cure time: parts, fixtures and space tied up
A potting resin has to cure. Depending on the product and the temperature, that takes hours, sometimes days. Meanwhile, parts sit on a shelf, fixtures are tied up and the batch can't ship.
This delay has a sneaky side effect: you only discover a problem after the cure. A wrong ratio or contamination shows up the next day, when the whole batch is already set. You've lost the material, the parts and a day.
5. Equipment, materials and waste
Good potting takes more than a cup and a stir stick. To avoid bubbles, the resin has to be degassed under vacuum, sometimes a second time after pouring. Add a mixer or dispenser, molds, fixtures, sometimes an oven. All of it has to be bought, maintained and calibrated.
Materials also generate their own losses:
Pot life: the mix cures in the container if you wait too long, and a 10 °C increase roughly halves the available working time.
Package sizes: engineering resins are often sold in packages far too large for a few dozen parts.
Shelf life and storage: humidity, temperature and cross-contamination degrade opened products.
Waste: unused resin, containers, gloves and rags must be handled as chemical waste.
6. Health, safety and compliance
Epoxy resins are a known skin sensitizer. In a Danish study published in 2023, workers exposed to epoxy components had about 2.4 times more dermatitis than their unexposed colleagues. The risk was highest in the first year of exposure, precisely among less experienced workers.
Once sensitized, a person may react to every new exposure, even to very small amounts, and sometimes more and more strongly. In-house, you therefore need suitable gloves, safety glasses, good ventilation, safety data sheets, WHMIS training and handling procedures.
7. Dependence on a single person
In many companies, the potting "knack" rests on one person. They know how long to degas, how to tilt the mold, which resin lot was temperamental. None of it is written down. When that person goes on vacation, changes roles or leaves the company, quality drops.
When in-house is still the right choice
Outsourcing isn't always the right answer. Keeping potting in-house makes sense in several cases:
Very small, one-off volumes: a few prototypes to validate a concept.
A team that is already equipped and trained: the equipment is paid off and the process is documented.
Extreme confidentiality constraints: the parts cannot leave your facility.
There is no magic volume above which you should outsource. The threshold depends on the complexity of the part, your quality requirements and the resources you have. Hence the value of running the numbers with your own figures.
The worksheet: calculate your real cost per part
Fill in this table for one year of production, then divide the total by the number of good parts. You'll get a unit cost you can compare with a quote.
Item | How to calculate it |
Direct labour | Potting hours × loaded hourly rate |
Diverted engineering | Lost design hours (setup, interruptions, troubleshooting) × loaded rate |
Rejects | Rejected parts × full assembly value (board, components, cables) |
Customer returns | Field failures × replacement, shipping and service cost |
Materials | Resin used + resin lost (pot life, expiry, opened packages) |
Equipment | Amortized purchase (vacuum chamber, mixer, molds, oven) + maintenance |
Health and safety | Protective equipment, ventilation, training, waste management |
Delays | Weeks added to the project × value of one week of sales or project time |
Total ÷ good parts | Your real cost per part |
Then compare that figure with a subcontractor's unit price, tooling included. In many cases, the gap is much smaller than expected, or it reverses.
In summary
Resin is the most visible cost of in-house potting, but rarely the biggest. Engineering time, interruptions, rejects, cure time, equipment, health and safety, and dependence on a single person often change the conclusion. Before you decide, run the full calculation.
Want to compare with your own numbers? Fill in the worksheet, then ask us for a quote on the same part. We'll help you compare line by line.
Sources
ASQ, "Cost of Quality"
Fast Company, "Worker, Interrupted: The Cost of Task Switching", 2008; Mark, Gudith and Klocke, "The cost of interrupted work", CHI 2008
ALLPCB, "Vacuum potting demystified"; Industrial Technology, "Avoiding voids in potting applications"
EASE, "Prevention vs detection vs correction"
Wiring Harness News, "Low-pressure molding vs potting"; Epoxyworks, "Epoxy shelf life"
Christiansen et al., Contact Dermatitis, 2023; WEST SYSTEM, "Health effects from overexposure to epoxy"